RT @HelmsProject: With the discovery of the Eyes (@genesiseyenft) , the blacksmiths of the Realms delved into the ancient lore a
27 Jan 2023,   15:33
RT @HelmsProject: With the discovery of the Eyes (@genesiseyenft) , the blacksmiths of the Realms delved into the ancient lore and unlocked… 
Same news in other sources
227 Jan 2023,   15:44
Daily Bag: 202 
 
We warned him 
But the grimoire sent him blind. 
Some days the assembly rings 
And he doesn’t join the line 
One of us runs out to the moor 
To find him wandering 
His bare knees unscratched somehow 
By the endless thorny heather.  
Daily Bag: 202. We warned him. But the grimoire sent him blind. Some days the assembly rings. And he doesn't join the line.
Daily Bag: 202
We warned him
But the grimoire sent him blind.
Some days the assembly rings
And he doesn’t join the line
One of us runs out to the moor
To find him wandering
His bare knees unscratched somehow
By the endless thorny heather. https://t.co/jrOD0nu0zQ
27 Jan 2023,   15:34
Prepare for war 
 
  
Prepare for war.
Prepare for war
https://t.co/CEcxGNakiV https://t.co/ygzeLiSFpY